they are devastating floods in Tsholotsho. It was the Honourable Minister’s view that
it is a well-known fact that Tsholotsho is a generally low-lying area and therefore
vulnerable to floods, but the villagers were not keen on moving from flood affected
areas leaving behind the graves of their ancestors. They also like the good soils and
grazing available in the area and there is no alternate suitable land in the vicinity,
Therefore he recommended that there was a need to do away with the traditional
structures and build more permanent structures with strong foundations that cannot
be washed away by floods.
The ZHRC delegation also held a meeting with the District Administrator for
Tsholotsho District, Ms Nosizi Dube and selected members of the Civil Protection
Unit. The DA mentioned that no one was displaced (apart from temporary relocation
whilst waiting for the water to subside), only shelter was destroyed and those
affected were given tents to settle in their homesteads where they were able to
attend to the protection of their cattle and other livestock. She expressed her utmost
gratitude to the State and other stakeholders for reacting swiftly during the floods,
hence preventing the situation from being dire. She stated that one life was lost and
those who were injured were treated and discharged on site. The life lost was that of
a child who had drowned, after failing to realise that the water was rising.
In the Sipepa area, Zimbabwe Defence Forces (ZDF) helicopters were used to air lift
the marooned villagers as the roads were inaccessible. The DA recommended that
there was need to build stronger structures in place of the weaker and temporary
ones which the villagers built. The weaker structures were built with dagga and
poles. Further she reiterated the Honourable Provincial Affairs Minister’s sentiments
that there was a need to have a disaster risk management plan at all levels
(including ward and village level). She however expressed her concern that in as
much there was a swift and positive reaction some stakeholders’ intervention was
motivated more by the need to gain mileage for their organisation than the best
interest of the communities hence their insistence on visibility and control over the
modalities of assistance despite the CPU’s capacity to coordinate and properly
distribute such assistance.