6.3 Logistics BVR Process
The logistical challenges experienced during observer accreditation continued into the BVR Blitz
exercise, albeit at a low scale. ZESN observations were to the effect that the logistical challenges were
not significant regarding proportions, although in some instances these challenges affected the ability of
aspiring registrants to register. Most of the logistical problems were however dealt with by phase 4 of
the registration process, with ZEC responding to equipment failures, shortages, especially of stationary,
and most registration centres opening ahead of and on time over 90% of the time. The figure below lists
the kind of logistical challenges that ZESN noted during the BVR process during all phases.
Figure 2 ZEC BVR Logistical & Preparedness Challenges
6.4 Significant Logistics and Preparedness Challenges
Preparatory and logistical challenges included failure to open and late opening of some registration
centres. During phase 1, ZESN noted that Gokwe, Bikita, Binga, St Mary's Ward 3, and other areas failed
to open due to rains. The Mabvuku Tafara Sub-regional office was unable to open for registration after
ZEC had changed the location without prior communications to the community and the Registrar
Generals staff who operated at the sub-regional office. Unannounced changes of registration centres
were also reported in Budiriro amongst other places. Late openings were noted at various registration
centres with the worst being the registration centre at Ward 5 in St Mary’s Chitungwiza, which opened
at 1300 hours instead of the advertised 0700 hours. In Phase 2 this challenge was witnessed at
Nyaradzai Hall in Zvishavane, Mberengwa, East, West and South, in wards 5, 27, and 3 respectively, as
well as Nyanga North (ward 28). This challenge persisted into Phase 3 and 4 but at lower levels.
23
Select target paragraph3
Add to table of contents